Wood County road construction update

Crews continue to work on Highway 10 making it into a four-lane highway between Marshfield and Stevens Point. The Wisconsin Department of Transportation has posted the following updates for the construction:

*On Highway 10 from Klondike Drive to Wood County Highway BB, there will be a lane open in each direction with a 12-foot width restriction.

*Blenker Road off of Highway 10 is now open; Highway N from existing Highway 10 to two miles north will be closed until mid-November and no detour will be posted.

*Highway A south of the intersection with existing Highway 10 to Mill Creek Road is closed until late-November. Traffic will be detoured on Highway N and Highway 13.

As always, the DOT requests motorists to slow down and stay alert while driving through construction zones. Consider taking a different route and avoid busy travel times in order to avoid delays. Call 511 or visit www.511wi.gov for statewide traveler information.

 

 


About VOICE Staff

This story was compiled through information obtained by the staff at the VOICE.

Leave a Reply